Automating Production Scheduling for a Label and Packaging Manufacturer

At one facility of a global label and packaging manufacturer, building the daily production schedule could take four or more hours of a planner's day. Torvyn designed and demonstrated a way to generate that schedule automatically, using data the plant already had.

At a Glance

  • Who: a global label and packaging manufacturer with more than 100 production facilities 

  • Problem: production schedules built by hand every day

  • Solution: a rules-driven scheduling engine that works with existing systems

  • Status: designed and demonstrated, not yet in production

The Problem: Scheduling by Hand

 Production scheduling meant deciding which jobs run on which equipment, and in what order. Every decision meant weighing ship dates, job priority, available production hours, printer capabilities, finishing requirements, and ink and material specifications.

The information existed across the plant's systems. Turning it into a schedule still depended on experienced employees reviewing it and making each call by hand.

What It Was Costing

  • About four or more hours of planner time a day at the facility evaluated

  • A schedule that depended heavily on experienced employees

  • Potential effects on production efficiency, equipment use, changeovers, throughput, and how quickly the plant could respond when priorities changed

Why Existing Systems Weren't Solving It

The gap was not access to data. The plant's existing systems held much of what planners needed. What was missing was a production scheduling tool that could combine that data and apply the plant's own rules to produce a sequence the floor could run.

This is common. Many manufacturing and warehouse operations have capable systems and still rely on people to bridge the gaps between them

The Approach

Torvyn worked with members of the manufacturer's operations team to map how scheduling happened, what data was available, and what planners weighed when sequencing work.

 

Torvyn's engineering and leadership team then turned those requirements into a proposed workflow and demonstrated it back to the manufacturer. Two findings shaped the design.​

  • Sorting by due date is not enough. Real schedules balance many factors at once. The solution had to be a rules-driven optimization engine, meaning software that weighs several rules together to find the best order.

  • It had to fit what was already there. That meant working with existing systems, handling each site's own rules and equipment, and giving recommendations planners can understand and act on.

The Solution: What Torvyn Designed

Torvyn designed a production scheduling engine that works in five steps.

  1. Brings the data together. Job and production information comes from the ERP and from ink and specification sources.

  2. Applies the plant's rules. Ship date, job priority, available hours, printer and equipment requirements, and finishing requirements are all configurable.

  3. Recommends a sequence. Each production resource gets a recommended job order.

  4. Shows what needs attention. Dashboards display the schedule, and alerts flag conditions that need a decision.

  5. Recalculates as things change. New information produces an updated schedule.

Flow Diagram - Tyler Morgan - Logo added (1).png

What a Planner's Day Would Look Like

Planners would start with an optimized schedule, not a blank page. They would review the recommended sequence, respond to exceptions and priority changes, and adjust where human judgment is needed.

Projected Impact

These are projections based on the manufacturer's own operational data. The solution has been designed and demonstrated. It is not yet running in production.

  • Most confident: a significant reduction in the planner time spent building schedules, plus faster and more repeatable decisions from a production scheduling tool that applies the same rules every time.

  • To be measured in a pilot: improvements in throughput, equipment utilization, and changeovers.

Where Else This Applies

The same approach fits any production or warehouse operation where key decisions still depend on manual analysis across disconnected systems. Often the answer is not replacing the technology already in place. It is connecting it and applying the operation's own rules.